PAX Terminal to undergo renovations
Col. Jimmy Canlas, 437th Airlift Wing commander, swings a sledgehammer to start construction of the new 437th Aerial Port Squadron Passenger Terminal here, Feb. 23, 2017. The passenger terminal is being renovated to improve the facility by adding a new fire suppression system, roof, utility systems, restrooms inside the gated area and a redesigned family room. The passenger terminal will operate out of a temporary facility until construction is complete. Signage is in place to direct passengers and base personnel from the old terminal to the temporary location.
PHOTO BY:
Airman 1st Class Megan Munoz
VIRIN:
170223-F-YM277-0020.JPG
FULL SIZE:
1.28 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.